Venue Stampede is now available for Batchsubmit.

Support

Support Options

Submit a Support Ticket

 

NEES Project Warehouse

Behavior and Design of Cast-in-Place Anchors under Simulated Seismic Loading
Curation progress:

Experiment contains unprocessed data, required metadata and documentation.

Complete - 03/08/2013

What's this?

The curation dashboard shows your progress as you add required elements to your project or experiment.

Complete
Incomplete
None
Phase II - Monotonic Shear in Reinforced Concrete
|
DOI:10.4231/D39S1KK59
Experiment Type: Large Scale
Description: Monotonic shear tests of single cast-in-place anchors in reinforced concrete.
Dates: September 13, 2010 - November 19, 2010
Facility: University of Wisconsin-Milwaukee, WI, United States
Equipment:
Specimen Type: 0.75 in. diameter F1554 anchors and 1 in. diameter A193 Grade B7 anchors
Material: 1 in. diameter A193 Grade B7 anchors 1 in. diameter A193 Grade B7 anchors (view)
0.75 in. diameter F1554 Grade 55 anchors 0.75 in. diameter F1554 Grade 55 anchors (view)
Sensors: Phase II shear tests
Drawings:
Data:
Trial ( ? ) Repetition ( ? ) Interactive ( ? ) UnprocessedConvertedCorrectedDerived
Loading Trial-1..
Loading Trial-2..
Loading Trial-3..
Loading Trial-4..
Loading Trial-5..
Loading Trial-6..
Loading Trial-7..
Loading Trial-8..
Loading Trial-9..
Documentation:
Related Documents:
Analysis:
No files available
Images:
Tags (keywords):
  1. Headed anchor bolt
  2. composite construction
  3. fastening to concrete
Cite this work:
Derek Petersen, Jian Zhao (2013). "Phase II - Monotonic Shear in Reinforced Concrete", Network for Earthquake Engineering Simulation (distributor), Dataset, DOI:10.4231/D39S1KK59