NEESR-II: A Seismic Study of Wind Turbines for Renewable Energy
No reviews have been created for this project. Review This Project

To compare experiments, please select at most four experiments from the experiment list below.

Sort By:   

  Experiment-1: NEG Micon 53.6m Ambient Vibration In-Situ Testing
Dates: January 26, 2009 - January 27, 2009
Description: During January 26-27, 2009 ambient vibration testing was conducted on a 900 kW NEG Micon 53.6m high wind turbine. The experiment was conducted at Oak Creek Energy Systems near Mojave, California using the NEES@UCLA mobile testing field laboratory. Accelerometers...
Facility: University of California, Los Angeles, CA, United States
Enter experiment photo caption

 Launch

3 Interactive Files
view data


  Experiment-2: NEG Micon 53.6m Ambient and Forced Vibration In-Situ Testing
Dates: March 16, 2009 - March 20, 2009
Description: Following the January 2013 testing of Experiment 1, a second series of tests was conducted during March 16-20, 2009. Ambient vibration testing was conducted on the same 900 kW NEG Micon 53.6m high wind turbine of Experiment 1. The experiment was conducted...
Facility: University of California, Los Angeles, CA, United States
Enter experiment photo caption

 Launch

1 Interactive Files
view data


  Experiment-3: NEG Micon 53.6m Ambient Vibration Without Soil Accelerometers
Dates: March 24, 2009 - March 27, 2009
Description: Following Experiments 1 and 2, a third series of tests was conducted during March 24-27, 2009. Additional ambient vibration testing was conducted on the same 900 kW NEG Micon 53.6m high wind turbine of Experiments 1 and 2 (no soil surface accelerometers...
Facility: University of California, Los Angeles, CA, United States

 Launch

1 Interactive Files
view data


  Experiment-4: NEG Micon 53.6m Ambient Vibration Without Rotor or Soil Accelerometers
Dates: March 27, 2009 - March 28, 2009
Description: Following Experiments 1-3, a fourth series of tests was conducted during March 27-28, 2009. Additional ambient vibration testing was conducted on the same 900 kW NEG Micon 53.6m high wind turbine of Experiments 1 and 2 (no soil surface accelerometers...
Facility: University of California, Los Angeles, CA, United States

 Launch

1 Interactive Files
view data


  Experiment-5: NEG Micon 53.6m Ambient Vibration Without Gearbox, Rotor, or Soil Accelerometers
Dates: March 26, 2009 - May 13, 2009
Description: Following Experiments 1-4, a fifth series of tests was conducted during March 26- May 13, 2009. Additional ambient vibration testing was conducted on the same 900 kW NEG Micon 53.6m high wind turbine of Experiments 1-4 (no soil surface accelerometers...
Facility: University of California, Los Angeles, CA, United States

 Launch

1 Interactive Files
view data


  Experiment-6: NEG Micon 72m Ambient Vibration In-Situ Testing
Dates: June 17, 2009 - June 19, 2009
Description: During June 17-19, 2009 ambient vibration testing was conducted on an additional 1.5 MW NEG Micon 72m high wind turbine. The experiment was conducted at Oak Creek Energy Systems near Mojave, California using the NEES@UCLA mobile testing field laboratory...
Facility: University of California, Los Angeles, CA, United States
1.5-MW NEG Micon located at Oak Creek Energy Systems

 Launch

1 Interactive Files
view data


  Experiment-7: 2010 Turbine Shake Table Test
Dates: February 09, 2010 - March 31, 2010
Description: The amount of electricity produced from the wind has steadily grown since its introduction in the 1980s and with the introduction of AB 32 is poised to grow substantially in California. Through support from the United States National Science Foundation...
Facility: University of California, San Diego, CA, United States