  Experiment-1: Small Scale Testing - Phase 1
Dates: October 11, 2011 - October 11, 2011
Description: Single Site Test conducted with 1 MR Damper at either UCONN or UIUC, conducted three times as passive off, passive on and semi-active respectively at each site.
Test was conducted at one site with numerical models generated at the other site.
Facility: University of Illinois at Urbana-Champaign, IL, United States
University of Connecticut, CT, United States


  Experiment-2: Small Scale Testing - Phase 2: Multi Site Test
Dates: February 11, 2011 - March 31, 2011
Description: Test conducted with physical damper at a location with numerical model generated at other site, conducted in three states, passive on, passive off and semi-active. Test was conducted at two different times, therefore trials will list type with date for...
Facility: University of Illinois at Urbana-Champaign, IL, United States
University of Connecticut, CT, United States


  Experiment-3: Small Scale Testing - Phase 3: Multi Site Test (2 MR Dampers)
Dates: April 27, 2011 to Present
Description: Test conducted with physical damper(s) at a location with numerical model generated at other site, conducted in three states, passive on, passive off and semi-active. Both sites ran equal sets in equal states, therefore trials will reflect data accordingly...
Facility: University of Illinois at Urbana-Champaign, IL, United States


  Experiment-4: Large Scale Testing - Phase 1: Single Site Test
Dates: February 01, 2011 - March 01, 2011
Description: Single site tests were conducted at both UIUC and Lehigh. Tests were conducted with MR dampers located on the first and second floors of the 3-story building. The MR dampers were operated in Passive Off, Passive On and SemiActive.
Facility: University of Illinois at Urbana-Champaign, IL, United States


  Experiment-5: Large Scale Testing Phase 2: Multi-Site Test with Single Damper on 1st floor
Dates: June 09, 2011 - June 09, 2011
Description: Testing was conducted with physical models being at a certain location, either UIUC or Leihigh. Numerical models were generated at the other other site. States the tests were conducted in were Passive Off, Passive On and Semi-Active.
Facility: Lehigh University, PA, United States
University of Illinois at Urbana-Champaign, IL, United States


  Experiment-6: Large Scale Testing Phase 3: Multi-Site Testing with (2)MRD's on First Floor UIUC and (2)MRD's on Second Floor Lehigh
Dates: June 10, 2011 - July 10, 2011
Description: Tests were conducted with two MRD's(MR Damper) were placed on the first floor at UIUC and also at two at the second the floor at Lehigh. Physical Models were generated on one floor at one site, while other site provided second floor numerical models....
Facility: Lehigh University, PA, United States