Support Options

Submit a Support Ticket


NEES Project Warehouse

Self-Centering Damage-Free Seismic-Resistant Steel Frame Systems
Curation progress:

Completed curation, sent PRPP link to PI for review.

Complete - 11/11/2009

What's this?

The curation dashboard shows your progress as you add required elements to your project or experiment.

Experiment-1: Task 4: Develop Energy Dissipation Elements Appropriate for SC-MRF and SC-CBF Systems
Experiment Type: Large Scale
Description: This experimental task evaluates the development of an energy dissipation (ED) device for earthquake resistant self-centering steel moment resisting frames (SC-MRFs) with post-tensioned steel moment connections (PT connections). This work is part of the research being conducted by a group led by Lehigh University in collaboration with Princeton and Purdue Universities under the NSF funded NEESR-SG research program. Previous work demonstrates that steel MRFs with PT connections can achieve good performance under the design earthquake by reducing inelastic deformations and returning the structure to its pre-earthquake position. However, additional research is required with respect to energy dissipation (ED) of the connections. The scope of this study included the assessment of various ED devices for use in a PT connection. The ED devices were evaluated based on: energy dissipation capability, material characterization, distortion, capacity, device constructability, and life-cycle/maintenance characteristics. Various devices were assessed and friction devices were chosen for use as an ED device for the connection in the form of a bottom flange friction device (BFFD). The BFFD consists of a vertically oriented slotted plate shop welded to the bottom beam flange as well as two outer built-up angles field bolted to the column. Sandwiched between the two outer angles are brass friction plates on each side of the slotted plate. The slots are over-sized in order to allow for rotation of the connection. High strength bolts with disc-spring washers provide the normal force, compressing the entire assembly together. The BFFD is simple to construct and install, lacks interference with the composite slab, and has good energy dissipation characteristics. A simple analytical model for expressing the cyclic moment-relative rotation behavior of a PT connection with a BFFD was developed. A series of large-scale tests were conducted to experimentally evaluate the BFFD. The parameters evaluated in these tests included the level of friction force and keeper angles to minimize the lateral and transverse movement of the beam end at the beam-column interface. The effect of these parameters on the development of the limit states of the BFFD and subsequent effect on the connection behavior were studied. All tests were conducted using a cyclically symmetric loading protocol with the exception of one test which used an earthquake response loading. The results of the tests demonstrate that the BFFD is a viable way to dissipate energy in a PT steel moment connection for a SC-MRF.In all Test Conditions, one hydraulic actuator with a capacity of 460 kip (2050 kN) was used to impose the lateral displacement for simulating the seismic loading conditions. The far end of the actuator was attached to the laboratory strong wall via structural members and a cylindrical bearing. The actuator was attached to the test specimen using a cylindrical bearing that was bolted to two-4 inch thick clevis plates to evenly distribute the load to the specimen.All the test conditions and related tests are conducted by the test matrix file in descriptive files.
Dates: January 16, 2005 - March 14, 2008
Facility: Lehigh University, PA, United States
Equipment: View Details
Specimen Type: NEES-2005-0077
Material: Component 1 Component 1 (view)
Trial ( ? ) Repetition ( ? ) Interactive ( ? ) UnprocessedConvertedCorrectedDerived
Loading Trial-1..
Loading Trial-2..
Loading Trial-3..
Loading Trial-4..
Loading Trial-5..
Loading Trial-6..
Loading Trial-7..
Loading Trial-8..
Loading Trial-9..
Loading Trial-10..
Loading Trial-11..
Loading Trial-12..
Loading Trial-13..
Loading Trial-14..
Loading Trial-15..
Loading Trial-16..
Loading Trial-17..
Loading Trial-18..
Loading Trial-19..
Loading Trial-20..
Loading Trial-21..
Loading Trial-22..
Loading Trial-23..
Loading Trial-24..
Loading Trial-25..
Related Documents:
No files available
Tags (keywords):