Nees.org will be intermittently unavailable Wednesday, July 8, for scheduled maintenance. We apologize for any inconvenience.

Support

Support Options

Submit a Support Ticket

 

NEES Project Warehouse

Behavior and Design of Cast-in-Place Anchors under Simulated Seismic Loading
Curation progress:

Experiment contains unprocessed data, required metadata and documentation.

Complete - 03/08/2013

What's this?

The curation dashboard shows your progress as you add required elements to your project or experiment.

Complete
Incomplete
None
Experiment-15: Phase III tests - Anchors with Type F reinforcement
|
DOI:10.4231/D3DJ58G96
Experiment Type: Large Scale
Description: 2 monotonic and 2 cyclic tension tests of anchors with Type F reinforcement (8 No.3). The specimens had a 6-inch edge distance.
Dates: May 28, 2011 - May 28, 2011
Facility: University of Wisconsin-Milwaukee, WI, United States
Equipment:
Specimen Type: 1 in. Diameter A193 Grade B7 Anchors
Material: 1 in. Diameter A193 Grade B7 Anchors 1 in. Diameter A193 Grade B7 Anchors (view)
Sensors: Phase III Tests
Drawings:
Data:
Trial ( ? ) Repetition ( ? ) Interactive ( ? ) UnprocessedConvertedCorrectedDerived
Loading Trial-1..
Loading Trial-2..
Loading Trial-3..
Loading Trial-4..
Documentation:
Related Documents:
Analysis:
No files available
Images:
Tags (keywords):
  1. Headed anchor
  2. Anchor reinforcement
Cite this work:
Jian Zhao (2013). "Phase III tests - Anchors with Type F reinforcement", Network for Earthquake Engineering Simulation (distributor), Dataset, DOI:10.4231/D3DJ58G96